The plan and the current status of custom electronics for FAST sites (last modification: Jan, 16/2002)*:
BoardUFUCLAPNPIIHEP CERNDubnaSpareTOTAL
needed
as of
2/28/02
Resp. Univ. Comments
DMB 20012/1 2/0 2/0 2/0 2/0 2/0 1/8 13 9 OSU -
D360 2/1 2/0 2/0 2/0 2/0 2/0 1/8 13 9 OSU -
"DDU" 2/1 2/0 2/0 2/0 2/0 2/0 1/8 13 9 OSU -
Opt cable 2/1 2/0 2/0 2/0 2/0 2/0 1/8 13 9 OSU -
TMB 2/1 2/0 2/0 2/0 2/0 2/0 1/0 13 1 UCLA -
JTAG box 2/1 2/ 1/ 1/ 2/ 1/ 1/ 10 1 UCLA -
JTAG cable 2/1 2/ 1/ 1/ 2/ 1/ 1/ 10 1 UCLA -
CCB 20012/2 2/0 2/0 2/0 2/0 2/0 1/0 13 2 Rice -
Skewclear cable 26/ 26/ 26/ 26/ 26/ 26/ 13/ 169 - OSU -
Old Skew cables
(not 75 degree)
0/1 0/1 - - - - - 0 2 OSU -
LVMB cable 2/ 2/ 2/ 2/ 2/ 2/ 1/ 13 - UCD -
Small backplane 2/2 2/0 2/0 2/0 2/0 2/01/1 13 3 UF -

* Comment: two numbers mean: Plan/Current situation.

Notes:

  • All boards/cables are to be sent to UF. UF will redistribute them between sites.
  • Number of boards is counted based on the assumption that each site has two sets of boards and two sets of cables, one running plus one spare; plus one un-assigned spare.
  • One 13-cable set actually has 1 spare cable
  • Beam tests: 1 spare from UF, 1 spare from UC, 1 un-assigned spare.
  • JTAG is mostly for debugging purposes.