|
Home page
1. Hardware/software requirements
2. Hardware manuals
3. FAST-DAQ software
4. FAST-DAQ Setup
5. Assembly and Test Instructions
6. Problems encountered
7. Production Status
8. Parts tracking at FAST sites
9. EMU Schedule
10. Related sites
12. UF Pictures archive
13. Lexicon
14. Contact information
All comments and suggestions are welcome to:
Old version of this site is available here:
Old version
|
Assembly instructions
Assembly of a chamber with electronics and hardware
Cooling plates (all CSC types)
updated by Nelson Chester March 3, 2003.
AFEBs
(mantained by CMU)
Fixing CFEB loose screws
distributed by Ben Bylsma Feb 4, 2003
CFEBs and thermal pads [in PDF format]
(from Sergei Lusin, 04 June 2002)
CFEB-CSC cables:(from Ben Bylsma, 11/20/01)
[attached Power Point document]
LVDB and its thermal pad
[in PDF format] (from Sergei Lusin, 30 Jun 02)
ALCT
ALCT-AFEB cables
ME234/2,
ME1/2,
ME1/3,
ME2/1,
ME3/1,
ME4/1 (mantained by CMU)
LVDB Harness [in PDF format]
(from Sergei Lusin, 04 June 2002)
Covers: ME23/2, ME1/2, ME1/3, ME234/1
ALCT and test strip cables: ME23/2, ME1/2, ME1/3, ME234/1
Other instructions
Engineering Change Required to Gas CapPlug (from Nelson Chester, 02/07/02)
[attached MS Word document: Cap-Instruct.doc]
Some corresponding pictures:
P0007733.jpg,
P0007734.jpg,
P0007735.jpg,
P0007736.jpg,
Shipping box modifications at UF and UCLA
(message,
jpeg,
dwg) [from Nelson Chester, 18 Mar 2002]
Integration drawings:
Drawing of integration (from Jeff Brandt, 08/29/01)
[attached documents:
- Chamber_Integration_BOM's.xls
- 400057-01-A_ME234-2_plate_mtg_hls.dwg
- 400057-02-A_ME234-2_plate_elect_hls.dwg
- 400124_ALCT_384_assy.dwg
- 400056-A_ME234-2_cooling_plate_assy.dwg
- 400223_ME234-2_ALCT_Electronics_Assy_Kit.dwg]
|