Department of Physics, UF Final Assembly & Testing Site
University of Florida
US CMS

Home page


1. Hardware/software requirements
2. Hardware manuals
3. FAST-DAQ software
4. FAST-DAQ Setup
5. Assembly and Test Instructions
6. Problems encountered
7. Production Status
8. Parts tracking at FAST sites
9. EMU Schedule
10. Related sites
12. UF Pictures archive
13. Lexicon
14. Contact information



All comments and suggestions
are welcome to:

Old version of this
site is available here:
Old version

Production status

Status at Primary Assembly Sites

  • Panel production at FNAL
  • ME23/2 assembly at FNAL
  • ME2/1, ME3/1, ME4/1 assembly at PNPI
  • ME1/2, ME1/3 assembly at IHEP
  • Status of Final Assembly and System Test Sites
  • Assembly/Test Status at UC (at UC Final Assembly and Test Site)
  • Assembly/Test Status at UF
  • Assembly/Test Status at PNPI
  • Assembly/Test Status at IHEP (no link yet)
  • Tests at ISR (CERN)
  • CSC test results
  • CSC test results from UF
  • CSC test results from UC
  • CSC test results from PNPI
  • CSC test results from IHEP
  • [ Home | Hardware/software requirements | Hardware manuals | FAST-DAQ software | FAST-DAQ Setup | Assembly and Test Instructions | Problems encountered ]
    [ EMU Schedule | Production Status | Parts tracking at FAST sites | Related sites | Lexicon | Contact information ]