The Cryonet wire path in Williamson / Microkelvin

    One end of the cryonet is corner of the First floor hallway and the loading dock entrance hallway. It pierces the wall into room 130 were there are four "T" boxes with pairs of drop connectors along the west wall for the dewar storage area. The wire continues over the door and then through the floor at the LN2 pipe hole. It travels along the wall at the top of the metal stairs and enters into Rm 130A were the Commux and PC are located. The Commux has a built in network power supply to charge the cryonet boxes. It is the only network power in Williamson.
    It leaves Rm 130 A to go to the old Cryogenics area in the basement Rm 30. At the west end of Rm 30, there is a "T" box with a double drop. It then goes into the basement hallway to a "T" box Triple drop overhead and in front of the elevator.
    Then to Rm 43 under Rm 141 and up into Rm 141. It doubles back to Rm 30 and into Rm 29, where it goes to the south wall to the gasmen. Then Through the floor into Rm 129, Back down and then through the floor into 129A, which used to be the Larry F's electronics workroom, and therefore was a cryonet hub. Back down into the crawl space to Rm 107, 106, 112, and then back to Rm 29 were it feeds into a fiber optic repeater pair to isolate Williamson and Microkelvin electrically.
    It enters a conduit out to Microkelvin.  It emerges at the dewar storage area where there is a "T" box double drop and a wall transformer for network power. It then travels to Bay three, two and finally one.

Sketch



This webpage is administered by the
Cryogenic Services at the University of Florida in the Department of Physics
page contact

Disclaimer