DAQ timing studies with several pathway (HDI) options (R-Phi only, outer 4 layers) using Monte-Carlo generated top
events with pile-up (mean=3, sig=30cm) and 5% noise (7 page Acrobat PDF file
or Microsoft Word DOC file, August 18, 2001).
DAQ timing studies (total and R-Phi, all 6 layers)
using several Monte-Carlo generated processes (sig=30cm) and 5% noise (12 page Acrobat PDF file
or Microsoft Word DOC file, September 9, 2001).
DAQ timing studies with several layer 3 pathway (HDI) options (total and R-Phi, all 6 layers)
using Monte-Carlo generated jet
events with pile-up (mean=3, sig=30cm) and 5% noise (4 page Acrobat PDF file
or Microsoft Word DOC file, September 16, 2001).
Send comments and suggestions to rfield@phys.ufl.eduRick Field - Last modified: September 16, 2001